Fight with though material
24.01.2023 r.

At the RADOCHA II wastewater treatment plant in Sosnowiec, works for biological reactors no 7.7 and 8.8 are in full swing. Elements of technological equipment and supporting structures are dismantled. At the same time, the partition walls are reinforced.

These activities will lead to a state in which, in good weather conditions, works related to the repair of concrete surface of walls and bottom slab and their protection will begin.

Install